+995 598 14 15 32

Popular

Loading…

Pages

ProjectsCustom designServicesBlogFAQAbout usContact

Three packages (the Start Package, the Permit Package and the Full Package) and individual services. Before choosing, get a free consultation with a manager.

Which package do you need?
  1. Do you need a building permit?

Start Package — from 1,200 ₾from $460

10 working days

You need the drawings and will handle the rest yourself.

What you get:
  • House floor plans, elevations and sections
  • Structure: foundations, floor slabs, roof and columns, with material quantities
  • Door and window schedule

Ideal if: you are building in the regions or abroad with your own builder · you want quotes from builders first · you will think about the permit later.

Good to know: the structure is designed for average soil. To submit the design to the municipality it will need fitting to the plot and surveys; this is included in the Permit Package.

⭐ Most often chosen

Permit Package — from 7,000 ₾from $2,700

Permit documents in ~3 weeks · building permit in 2–4 months*

You want the permit without having to go to the municipality yourself.

Everything in the Start Package, plus:
  • Fitting the design to your plot (placement and one round of minor changes)
  • Plot survey (topographic plan)
  • Soil investigation and structural recalculation for your soil, with expert reviews
  • Energy efficiency report
  • Construction organisation plan (simplified for a private house) and the site information board
  • All three municipality stages: preparing and submitting the documents and addressing comments (2 rounds)
  • 🎁 A structural shell cost estimate as a gift. The municipality doesn’t require it, but we prepare it anyway so you can start talking to builders with exact figures.
Timeline:
  1. Surveys ~2 weeks
  2. Municipality: site development conditions ~1 month (meanwhile we already prepare the placement of the design)
  3. Final fitting ~1 week
  4. Municipality: permit ~1.5–2 months

= 2–4 months

ANBAMunicipality

Our own work takes ~3 weeks: with a ready-made project you get the permit ~1 month sooner than with a custom one. We manage the municipality stages, so you don’t have to go there.

*The timeline depends on the municipality: in a protected zone or on a difficult plot it may take longer. We’ll tell you exactly during the free plot assessment.

Not included: the municipal fee · a tree survey (needed only in certain zones, priced separately) · more than one round of changes.

We’ll give you the exact price after the free plot assessment; the cadastral code is enough.

Full Package — individual price

You want everything ready to start construction.

Everything in the Permit Package, plus:
  • Detailed working drawings: junctions and details, everything the builder needs
  • Full construction cost estimate
Add as needed:

Timeline: the working drawings are prepared alongside the permit and add no time to it.

Included in the Permit Package:

  • Plot survey[text to come][price]
  • Soil investigation and expert review[text to come][price]
  • Structural expert review[text to come][price]
  • Energy efficiency report[text to come][price]
  • Submission to the municipality and addressing comments[text to come][price]

In the Full Package or separately:

  • Working drawings[text to come][price]
  • Full cost estimate[text to come][price]
  • Engineering systems (MEP)[text to come][price]
  • Interior[text to come][price]
  • Architect’s supervision[text to come][price]
  • Landscaping plan[text to come][price]

What a building permit requires

For the building permit for a private house (Class II) you need:

  • Site development conditions, if no detailed plan applies to the plot
  • Plot survey (topography) and soil investigation (engineering geology)
  • Architectural design and structural scheme
  • Expert reviews of the soil investigation and the structure
  • Energy efficiency report
  • Construction organisation plan (simplified) and the site information board

All of this is included in the Permit Package. All that is left for you is to pay the permit fee.

A design of the engineering systems (water, power, heating) is not required for the permit, but we recommend it for construction; you can add it to the Full Package.

Choose a planConsultation

Ordering and payment

  1. Choose a plan

    Click “Place order” below the plan price.

  2. Choose an option and fill in your details

    The Start Package or the Permit Package, plus the details for the contract.

  3. Get the contract and invoice

    A manager contacts you and emails the documents.

  4. Pay and sign

    Pay the invoice at any commercial bank in Georgia and send us a photo or scan of the signed contract. The Permit Package is paid in three stages (see below).

  5. Receive the documents

    Start Package: within 10 working days. Permit Package: in stages, up to the building permit.

Payment in 3 stages — Permit Package

  1. 40%
    Stage IStarting work and studying the plot

    Paid when the contract is signed. At this stage we examine your plot and establish the conditions needed for building on it.

  2. 40%
    Stage IIPreparing the permit design

    Paid when we start on the full design documentation: topography, the geological survey, and the architectural and structural parts.

  3. 20%
    Stage IIIObtaining the building permit

    You pay the remaining 20% at the very end, once we have officially obtained the building permit from the municipality.

You pay the last part only for the final result: a permit already issued.

Secure paymentYou pay only by bank transfer against an invoice from ANBA LLC. We never ask you to pay to any other account.