On a slope at the edge of a forest the house climbs three levels above the street. The lower level is set into the hillside: the garage and the entrance sit in a niche with a timber soffit, and its roof carries the main-level terrace, with an infinity pool rising beside it as a concrete block. The dark base opens fully to the view in glass on the south and steps out to a garden terrace at ground level on the north. On top lies a light box rotated by 20°: its corner projects more than 3 m over the terrace, with a warm timber soffit below. Three materials — dark and light large-format porcelain stone and thermo-ash — and a lift and stairs link all three levels.
Who this house is for
[text to come]
Total area
408.4 m²
Garage area
37.8 m²
Footprint
21 × 8 m
Floors
Three-story
Bedrooms
4
Bathrooms
4
Roof
Flat, 2°
House height
11 m
Ceiling height
3.00 m
Garage
2 cars
Building class
IIIiClass III: for the permit the architectural design needs an additional expert review, already in the price. Details are under “Why Class III?” below the packages. The class is set by the highest parameter: area, height, foundation depth, span or a lift.
Plot
[data to come]
Start Package
4,900 ₾$1,890 (4,900 ₾)
Structural shell, est.**
≈ 211,700 ₾$81,700
[text to come] ** $200/m², a rough guide; depends on materials, region and builder. ANBA does not carry out construction.
Floor plans
5Hall35.6 m²
6Stairs6.6 m²
7Kitchen, dining and living room62.7 m²
8Pantry4.0 m²
9Guest room15.8 m²
10Guest bathroom4.2 m²
11WC2.8 m²
12Study11.3 m²
Useful area143.0 m²
Terrace and deck54.0 m²
Garden terrace84.0 m²
Room list
5Hall35.6 m²
6Stairs6.6 m²
7Kitchen, dining and living room62.7 m²
8Pantry4.0 m²
9Guest room15.8 m²
10Guest bathroom4.2 m²
11WC2.8 m²
12Study11.3 m²
Useful area143.0 m²
Terrace and deck54.0 m²
Garden terrace84.0 m²
Sketch. Working drawings are part of the plan set.
Sections
Section 1-1
Indicative site plan: plot 30 × 40 m. Placement on your own plot is set from its topographic survey.
Yes → Do you want your builder to work from detailed drawings and an exact budget? No → Permit Package · Yes → Full Package
Start Package — 4,900 ₾$1,890
10 working days
You need the drawings and will handle the rest yourself.
What you get:
House floor plans, elevations and sections
Structure: foundations, floor slabs, roof and columns, with material quantities
Door and window schedule
Ideal if: you are building in the regions or abroad with your own builder · you want quotes from builders first · you will think about the permit later.
Good to know: the structure is designed for average soil. To submit the design to the municipality it will need fitting to the plot and surveys; this is included in the Permit Package.
⭐ Most often chosen
Permit Package — 18,500 ₾ ±10%$7,150 ±10%
Including Class III requirements
Permit documents in ~3 weeks · building permit in 2–4 months*
You want the permit without having to go to the municipality yourself.
Everything in the standard Permit Package, plus:
Expert review of the architectural design (Technical Regulation No. 41)
Study of the impact on neighbouring buildings (if needed)
Everything in the Start Package, plus:
Fitting the design to your plot (placement and one round of minor changes)
Plot survey (topographic plan)
Soil investigation and structural recalculation for your soil, with expert reviews
Energy efficiency report
Construction organisation plan (simplified for a private house) and the site information board
All three municipality stages: preparing and submitting the documents and addressing comments (2 rounds)
🎁 A structural shell cost estimate as a gift. The municipality doesn’t require it, but we prepare it anyway so you can start talking to builders with exact figures.
Timeline:
Surveys ~2 weeks
Municipality: site development conditions ~1 month (meanwhile we already prepare the placement of the design)
Final fitting ~1 week
Expert review [time]
Municipality: permit ~1.5–2 months
= 2–4 months
ANBAMunicipality
Our own work takes ~3 weeks: with a ready-made project you get the permit ~1 month sooner than with a custom one. We manage the municipality stages, so you don’t have to go there.
*The timeline depends on the municipality: in a protected zone or on a difficult plot it may take longer. We’ll tell you exactly during the free plot assessment.
Not included: the municipal fee · a tree survey (needed only in certain zones, priced separately) · more than one round of changes.
We’ll give you the exact price after the free plot assessment; the cadastral code is enough.
Full Package — individual price
You want everything ready to start construction.
Everything in the Permit Package, plus:
Detailed working drawings: junctions and details, everything the builder needs
Full construction cost estimate
Add as needed:
Timeline: the working drawings are prepared alongside the permit and add no time to it.
Why Class III?
This house is Class III because it has a lift.
What this means for you:
For the permit the architectural design needs an additional expert review, and sometimes a study of the impact on neighbouring buildings. We handle this, and it is already in the price.
When construction is finished compliance is checked by an accredited body, and before the house is accepted into use the internal common parts, utility networks and yard landscaping must be complete. Allow for this in the construction budget and schedule from the start.
Which package should I choose?
If you don’t need a permit or are building with your own builder, the Start Package. If you need a permit, the Permit Package: we handle everything, including the municipality. If you want your builder to have detailed drawings and an exact budget, the Full Package.
What does a purchased plan include?
Start Package: plans, elevations, sections, the structure with material quantities and the door and window schedule. Permit Package: on top of the Start Package, fitting the design to your plot, surveys, expert reviews, all three municipality stages and a structural shell cost estimate.
Can I make changes?
Yes. The Permit Package includes one round of minor changes (for example, moving a room or changing a window size). We assess larger changes separately and tell you the price and how the timeline changes beforehand. We don’t make changes that affect structural safety.
How soon will I get the plan?
The Start Package within 10 working days. With the Permit Package we prepare the permit documents in ~3 weeks, and the building permit takes 2–4 months (with a custom project, 3–5 months); the rest is the municipality’s timeline. In a protected zone or on a difficult plot the municipality’s timelines may run longer. Making changes to an existing ready-made project extends the timeline.
Every design on this site is ANBA’s original copyrighted work. Please respect our work: do not use, copy or distribute these materials (including for construction) without our written permission. Otherwise we reserve the right to take the measures provided by law.